PDF

GB/T 20801.4-2020

GB/T 20801.4-2020 Pressure piping code—Industrial piping—Part 4:Fabrication and assembly

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2020-11-19

Abstract

This part of GB/T 20801 specifies the basic requirements for the fabrication and installation of pressure pipelines. These basic requirements include provisions for fabrication, welding, preheating, heat treatment, assembly and installation, and pipeline cleaning.
This part applies to the fabrication and installation of pressure pipeline components defined in the scope of GB/T 20801.1.

General Product Information

Document Type National standards
Standard Status Replaced
Standard Code GB/T 20801.4-2020
CCS Pressure vessel
ICS Pipe components and pipelines
Implement Date 2021-06-01
Price $ 114
Subtotal $ 114
Tax $ 0.00
Order Total (incl. tax) $ 114

Log In

Contact Us