PDF
GB/T 7178.2-2006
GB/T 7178.2-2006 The operating for railway shunting—Part 2:Preparing operation
Abstract
This part of GB/T 7178 specifies the procedures, items, contents, operating personnel, technical requirements, etc. for the preparation of shunting operations on railways.
This part is applicable to the preparation of shunting operations on national railways, joint-venture railways, local railways, and dedicated railways.
General Product Information
| Document Type | National standards |
|---|---|
| Standard Status | Abolished |
| Standard Code | GB/T 7178.2-2006 |
| CCS | Railway transport |
| ICS | \nRailway transportation |
| Implement Date | 2007-01-01 |
Price
$ 50
Subtotal
$ 50
Tax
$ 0.00
Order Total (incl. tax)
$ 50