PDF
T/DGGC 016-2022 Active
T/DGGC 016-2022 Duct boring start, receive and empty push construction technical specifications
Abstract
This document specifies the general requirements for the launch, reception, and empty push operation of shield tunneling machines, including construction preparation, shield launch, shield reception, and shield empty push. This document is applicable to the launch, reception, and empty push of earth pressure balance shield tunneling machines and sludge balance shield tunneling machines.
General Product Information
| Document Type | Group standards |
|---|---|
| Standard Status | Active |
| Standard Code | T/DGGC 016-2022 |
| CCS | Earth and stone work, tunnel engineering |
| ICS | Earthwork, excavation, foundation construction, and underground engineering |
| Implement Date | 2023-01-01 |
Price
$ 26.00
Subtotal
$ 26.00
Tax
$ 0.00
Order Total (incl. tax)
$ 26.00