PDF
T/DZJN 89-2022 Active
T/DZJN 89-2022 Data center fluor pump air conditioning technology standards
Abstract
Main technical content: 1. Data center fluorine pump air conditioning equipment 2. Design of the data center fluorine pump air conditioning system 3. Energy efficiency evaluation 4. Construction and installation 5. Commissioning and acceptance 6. Operation and maintenance
General Product Information
| Document Type | Group standards |
|---|---|
| Standard Status | Active |
| Standard Code | T/DZJN 89-2022 |
| ICS | Refrigeration technology |
| Implement Date | 2022-06-10 |
Price
$ 20.00
Subtotal
$ 20.00
Tax
$ 0.00
Order Total (incl. tax)
$ 20.00