PDF

T/CSTM 01003-2023 Active

T/CSTM 01003-2023 Electrical Performance Test Method for Phase-Change Memory Devices

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2023-03-07

Abstract

Scope: This document specifies the electrical performance test methods for phase-change memory cell devices, which are divided into device performance testing and device reliability testing. Device performance testing includes current-voltage characteristics, storage window, set-up time, set-up voltage, reset time, reset voltage, and power consumption; device reliability testing includes durability and data retention time. This document is applicable to phase-change memory cell devices (hereinafter referred to as "devices"). Main technical content: This document specifies the electrical performance test methods for phase-change memory cell devices, which are divided into device performance testing and device reliability testing. Device performance testing includes current-voltage characteristics, storage window, set-up time, set-up voltage, reset time, reset voltage, and power consumption; device reliability testing includes durability and data retention time. This document is applicable to phase-change memory cell devices (hereinafter referred to as "devices").

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/CSTM 01003-2023
CCS Electronic components and information technology
ICS Integrated circuits, microelectronics
Implement Date 2023-06-07
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us