GB/T 7276-1987
Active
T/JSQA 163-2023
Active
Group standards
T/JSQA 163-2023 Lithium-ion battery factory clean and dry room enclosure installation technical regulations
T/JSQA 163-2023 Lithium-ion battery factory clean and dry room enclosure installation technical regulations
Price:
$ 20.00
Basic Information
Standard Code:
T/JSQA 163-2023
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Civil engineering and architecture
ICS Name:
\nMetal structure
Publish Date:
2023-08-03
Implement Date:
2023-08-03
Scope
Scope: This document specifies the terms and definitions, basic requirements, and sub-project requirements for the enclosure structure (hereinafter referred to as "enclosure structure") of the lithium-ion battery factory's clean and dry rooms; Main technical content: This document applies to the installation and acceptance process of the enclosure structure of the lithium-ion battery factory's clean and dry rooms, including basic requirements, wall construction, ceiling construction, door and window installation, floor coating, high-efficiency filter installation, and gap sealing.
Development Information
Related Standards
JG 10-1999
Replaced
JG 10-1999 Bolted joints of space grid structures
JG 11-1999
Replaced
JG 11-1999 Welded joints of space grid structures
JG 12-1999
Abolished
JG 12-1999 Inspection and acceptance standard for steel space grid structures
JG/T 13-1999
Active
JG/T 13-1999 Tubular steel frame scaffolding
JG/T 8-1999
Replaced