T/CWEA 6-2019 Active Group standards

T/CWEA 6-2019 Guidance for the preparation of flood control plans during water conservancy and hydropower construction period

T/CWEA 6-2019 Guidance for the preparation of flood control plans during water conservancy and hydropower construction period

Publish Date: 2019-03-26 Implement Date: 2019-04-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CWEA 6-2019
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Hydropower projects
ICS Name: Hydraulic engineering
Publish Date: 2019-03-26
Implement Date: 2019-04-01

Scope

Scope: This standard applies to the preparation of flood control plans during the construction period of large and medium-sized water conservancy and hydropower projects. The preparation of flood control plans during the construction period of small-scale water conservancy and hydropower projects can be implemented with reference to this standard. Main technical contents: — General Provisions; — Basic Information; — Flood Control Standards and Measures; — Hydrological and Meteorological Forecasting; — Emergency Response; — Post-Disaster Disposal

Development Information

Related Standards

Contact Us