T/CEC 5075-2022 Active Group standards

T/CEC 5075-2022 Drainage design guidelines for pumped hydro storage power station construction

T/CEC 5075-2022 Drainage design guidelines for pumped hydro storage power station construction

Publish Date: 2022-10-26 Implement Date: 2023-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEC 5075-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Hydraulic engineering
Publish Date: 2022-10-26
Implement Date: 2023-02-01

Scope

1.0.1 These guidelines are formulated to standardize the design of diversion for the construction of pumped storage power stations, ensuring that the design is technologically advanced, safe and practical, and economically reasonable. 1.0.2 These guidelines are applicable to the design of diversion for the construction of pumped storage power stations. 1.0.3 For the design of diversion for the construction of pumped storage power stations, in addition to complying with these guidelines, it shall also comply with the provisions of the relevant national standards currently in force.

Development Information

Related Standards

Contact Us