DL/T 1331-2024 Active Industry standards-Electricity

DL/T 1331-2024 Testing guidelines for AC substation equipment without removing high-voltage leads

DL/T 1331-2024 Testing guidelines for AC substation equipment without removing high-voltage leads

Publish Date: 2024-12-25 Implement Date: 2025-06-25 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: DL/T 1331-2024
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Power testing technology
ICS Name: Integrated power station
Publish Date: 2024-12-25
Implement Date: 2025-06-25

Scope

This document specifies the general requirements, safety measures, test methods, and result analysis for conducting tests on AC power equipment without disassembling their high-voltage leads. This document applies to the testing of AC power equipment such as 110kV (66kV) and above power transformers, disconnecting switches, circuit breakers, oil-immersed current transformers, coupling capacitors, voltage transformers, parallel reactors, metal oxide surge arresters, and parallel capacitors without disassembling their high-voltage leads. Equipment below 110kV can be used as a reference for this testing process.

Development Information

Replace the following standards

Related Standards