T/HUWA 50001-2024 Active Group standards

T/HUWA 50001-2024 Pump equipment maintenance and calibration procedures for municipal sewage treatment stations

T/HUWA 50001-2024 Pump equipment maintenance and calibration procedures for municipal sewage treatment stations

Publish Date: 2024-12-17 Implement Date: 2025-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/HUWA 50001-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: \nWastewater
Publish Date: 2024-12-17
Implement Date: 2025-01-01

Scope

Scope: This document specifies the basic requirements, maintenance cycles, and operational and standby pump maintenance and overhaul, as well as safety requirements for pump equipment in urban wastewater treatment plants and wastewater lifting pump stations. This document is applicable to the maintenance and repair of pump equipment involved in urban wastewater treatment plants and wastewater lifting pump stations. Main technical content: The technical content of this specification mainly includes: the basic requirements for the maintenance and repair of pump equipment, the maintenance cycle requirements for pumps and important components, the on-site and off-site maintenance and repair items and requirements for different types of operational pumps, the maintenance and repair items and specific requirements for standby pumps, the related requirements before, during, and after the overhaul of equipment, as well as the safety requirements involved in the maintenance and repair of equipment.

Development Information

Related Standards

Contact Us