T/CPCIF 0299-2023 Active Group standards

T/CPCIF 0299-2023 Closed Management Construction Guidelines for Chemical Industry Park

T/CPCIF 0299-2023 Closed Management Construction Guidelines for Chemical Industry Park

Publish Date: 2023-10-31 Implement Date: 2024-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CPCIF 0299-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Chemical industry
ICS Name: Chemical production
Publish Date: 2023-10-31
Implement Date: 2024-02-01

Scope

Scope: This document specifies the general requirements, construction process, construction content, and operation and maintenance guarantees for the construction of closed-loop management projects in chemical parks. This document is applicable to the construction of closed-loop management projects in chemical parks. Main technical content: 5 Construction process 5.1 Construction process diagram 5.2 General provisions 5.2.1 The construction of closed-loop management projects in chemical parks may refer to the construction procedures for engineering projects. 5.2.2 The project management of closed-loop management projects in chemical parks may refer to GB/T 50326. 5.3 Preliminary consultation 5.3.1 Preliminary consultation for the construction of closed-loop management projects in chemical parks should include forms such as project proposals, feasibility studies, and design briefs. 5.3.2 Preliminary consultation work should be carried out in conjunction with overall safety risk assessment reports and traffic impact evaluations, and recommendations should be made in terms of closed-loop management measures, investment amounts, and benefit analyses. 5.4 Formulation of implementation plans 5.4.1 Principles for plan formulation 5.4.2 Plan formulation process 5.4.2.1 Situation investigation 5.4.2.2 Safety risk identification and traffic impact analysis 5.4.2.3 Determination of classified control areas 5.4.2.4 Formulation of hierarchical control measures 5.4.2.5 Planning and design 5.5 Construction and development

Development Information

Related Standards

Contact Us