T/SCDA 033-2023 Active Group standards

T/SCDA 033-2023 Reinforced Concrete Bamboo Pipe Pile with Prestressing by Precast Method

T/SCDA 033-2023 Reinforced Concrete Bamboo Pipe Pile with Prestressing by Precast Method

Publish Date: 2023-02-17 Implement Date: 2023-02-20 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/SCDA 033-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Earthwork, excavation, foundation construction, and underground engineering
Publish Date: 2023-02-17
Implement Date: 2023-02-20

Scope

Main technical content: This atlas introduces the pre-stressed concrete bamboo-jointed pipe piles (referred to as bamboo-jointed pipe piles), which are suitable for low-pile foundation of general industrial and civil buildings and structures in areas with seismic fortification intensity of 7 degrees and below. Among them, Type A piles and bamboo-jointed pipe piles with a reinforced concrete protective layer thickness of less than 35mm can only be used for foundation treatment, equipment foundations, and temporary building foundations. The design of low-pile vertical foundation of railway, highway, bridge, port, municipal, and water conservancy projects can refer to this atlas for use, but it should still comply with the provisions of the current national and industry-related standards

Development Information

Related Standards

Contact Us