T/SCJA 12-2022 The construction of an integrated law enforcement information system for road overloading is required with universal technical specifications
T/SCJA 12-2022 The construction of an integrated law enforcement information system for road overloading is required with universal technical specifications
Basic Information
Scope
Scope: This document specifies the general technical requirements for the architecture, functions, main contents, and testing methods of the integrated law enforcement information system for over-limit road transport. This document is applicable to the construction and operation of over-limit road detection stations, non-stop detection points, source enterprises, and over-limit management information systems of highway operation units by transportation authorities at all levels or comprehensive law enforcement agencies. Data analysis applications and law enforcement information system construction for highway entrance and exit over-limit transport management and traffic police departments' handling of over-limit violations of transport vehicles can be referenced for implementation; Main technical content: General technical requirements for the architecture, functions, main contents, and testing methods of the integrated law enforcement information system for over-limit road transport.