T/CES 049-2020 Active Group standards

T/CES 049-2020 AGCAVC System Performance Test Regulations for Photovoltaic Power Generation Stations above 35 kV

T/CES 049-2020 AGCAVC System Performance Test Regulations for Photovoltaic Power Generation Stations above 35 kV

Publish Date: 2020-10-26 Implement Date: 2020-10-29 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CES 049-2020
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Energy, nuclear technology
ICS Name: Solar energy engineering
Publish Date: 2020-10-26
Implement Date: 2020-10-29

Scope

Scope: This standard specifies the test conditions, test equipment, test platform, test content, test methods, and evaluation of test results for the performance testing of AGC/AVC systems in photovoltaic power stations. This standard applies to photovoltaic power stations connected to the grid at voltages of 35kV and above. Photovoltaic power stations connected to the public grid at a voltage of 10kV may refer to this standard for implementation. Main technical content: This standard complies with existing relevant laws, regulations, standards, and guidelines, and takes into account the requirements of grid operation and the development of photovoltaic power stations. It specifies the test conditions, test equipment, test platform, test content, test methods, and evaluation of test results for the performance testing of AGC/AVC systems in photovoltaic power stations. This standard applies to photovoltaic power stations connected to the grid at voltages of 35kV and above. The performance testing protocol for the AGC/AVC system of photovoltaic power stations connected to the grid at voltages of 35kV and above must meet the following technical requirements: (1) test conditions; (2) test equipment; (3) test platform; (4) test content and methods; (5) evaluation indicators of test results. Photovoltaic power stations connected to the public grid at a voltage of 10kV may refer to this standard for implementation. The starting point and basic principles of this standard are to ensure the safe, stable, and high-quality operation of the grid and photovoltaic power stations, while making the provisions as practical as possible, so as to facilitate understanding, citation, and implementation.

Development Information

Related Standards

Contact Us