GB/T 14541-1993
Replaced
T/CEC 227-2019
Active
Group standards
T/CEC 227-2019 Guidelines for Full-process Engineering Consulting of Thermal Power Generation Construction Projects
T/CEC 227-2019
Price:
$ 20.00
Basic Information
Standard Code:
T/CEC 227-2019
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Integrated power station
Publish Date:
2019-04-24
Implement Date:
2019-07-01
Scope
1.1 These guidelines stipulate the content of the whole process of engineering consulting for thermal power generation construction projects, including the preliminary stage, project preparation, project construction, and project completion stage. 1.2 These guidelines are applicable to the whole process or certain stages of new (modified or expanded) construction projects for thermal power generation, such as coal-fired, gas (oil)-fired steam combined cycle, municipal solid waste incineration, and biomass energy projects, as well as specialized engineering consulting services.
Development Information
Related Standards
GB/T 14542-1993
Replaced
GB/T 14542-1993 Guide for maintenance and supervision of transformer oil in service
GB/T 2819-1995
Active
GB/T 2819-1995 Mobile electric power plant, general specification for
GB/T 15149.2-1998
Abolished
GB/T 15149.2-1998 Performance and testing of teleprotection eguipment of power systems Part 2:Analogue comparison systems
GB/T 15153.1-1998
Replaced
GB/T 15153.1-1998 Telecontrol equipment and systems Part 2:Operating conditions Section 1:Power supply and electromagnetic compatibility
GB/T 17463-1998
Active