T/CI 611-2024 Active Group standards

T/CI 611-2024 Drilling and Pumping Pile Construction Technical Regulations for Peat Soil Areas

T/CI 611-2024 Drilling and Pumping Pile Construction Technical Regulations for Peat Soil Areas

Publish Date: 1970-01-01 Implement Date: 1970-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 38.00
Out of stock

Basic Information

Standard Code: T/CI 611-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: -
Publish Date: 1970-01-01
Implement Date: 1970-01-01

Scope

This document specifies the technical requirements for the construction of bored cast-in-place piles in peat soil areas, and establishes the contents of construction preparation, construction process, quality control, safe operation, acceptance, and maintenance during the post-construction defect period. This document is applicable to the entire process of construction, acceptance, and maintenance during the post-construction defect period of bored cast-in-place piles in peat soil areas.

Development Information

Word Count: 21 Thousand words

Related Standards

Contact Us