T/CEC 5025-2020 The depth requirements for the feasibility study of an electrochemical energy storage power station
T/CEC 5025-2020 The depth requirements for the feasibility study of an electrochemical energy storage power station
Basic Information
Scope
Main technical content: 1.0.1 To meet the filing requirements for electrochemical energy storage power station projects and standardize the depth of preliminary work, these regulations are formulated. 1.0.2 These regulations apply to the feasibility study work of newly built, expanded, or renovated electrochemical energy storage power stations with a rated power of 500 kW and a rated capacity of 500 kWh or more. 1.0.3 The feasibility study report for electrochemical energy storage power stations should take a comprehensive approach, considering factors such as construction scale, project characteristics, power development plans, and grid conditions, and determine the feasibility through a technical and economic comparison. 1.0.4 In addition to complying with these regulations, the feasibility study report for electrochemical energy storage power stations shall also comply with the provisions of the relevant national standards currently in force.