T/CWEA 5-2018 Active Group standards

T/CWEA 5-2018 The specification for compaction grouting pile technology

T/CWEA 5-2018 The specification for compaction grouting pile technology

Publish Date: 2018-09-29 Implement Date: 2019-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CWEA 5-2018
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Hydraulic and hydroelectric projects
ICS Name: Hydraulic engineering
Publish Date: 2018-09-29
Implement Date: 2019-01-01

Scope

Scope: This standard is applicable to the reinforcement and treatment of foundations such as sandy soils, silty soils, clay soils, gravel soils, and artificial fill soils. Main technical contents: — Design; — Grouting materials and slurry preparation; — Equipment and tools; — Construction; — Quality inspection, evaluation, and acceptance

Development Information

Related Standards

Contact Us