T/CSEE 0178-2021 Active Group standards

T/CSEE 0178-2021 Firepower Power Plant Electrical Monitoring and Control Management System Design Procedures

T/CSEE 0178-2021 Firepower Power Plant Electrical Monitoring and Control Management System Design Procedures

Publish Date: 2021-03-11 Implement Date: 2022-05-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CSEE 0178-2021
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Civil engineering and architecture
ICS Name: Integrated power station
Publish Date: 2021-03-11
Implement Date: 2022-05-01

Scope

Main technical content: This document specifies the system structure, networking mode, main station, communication management station, and basic technical conditions of the electrical monitoring and management system for thermal power plants, as well as the functional requirements, main technical indicators, and related requirements. This document is applicable to the design of new thermal power plant electrical monitoring and management systems, and can be used as a reference for expansion and renovation projects

Development Information

Related Standards

Contact Us