T/GSEA 002-2020 Active Group standards

T/GSEA 002-2020 Roof-mounted parallel grid photovoltaic power generation system design specification - preparation notes

T/GSEA 002-2020 Roof-mounted parallel grid photovoltaic power generation system design specification - preparation notes

Publish Date: 2020-12-01 Implement Date: 2021-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/GSEA 002-2020
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Energy
ICS Name: Solar energy engineering
Publish Date: 2020-12-01
Implement Date: 2021-01-01

Scope

Scope: This document specifies the design inputs, design outputs, and the form of design outputs in the design of rooftop grid-connected photovoltaic power generation systems, as well as the design of photovoltaic arrays, electrical design, monitoring system design, fire protection design, lightning protection design, and safety protection design. This document is applicable to the design, construction, commissioning, and acceptance of rooftop grid-connected photovoltaic power generation systems. The operation/investment, procurement, and maintenance of rooftop grid-connected photovoltaic power generation systems can also refer to this document for guidance. This document is not applicable to rooftop grid-connected photovoltaic power generation systems with energy storage, concentrating, tracking, double-sided power generation functions, or BIPV (Building Integrated Photovoltaics) forms. Main Technical Content: 1. Scope: To clarify the scope of application of this standard, it is specified that this document specifies the design inputs, design outputs, and the form of design outputs in the design of rooftop grid-connected photovoltaic power generation systems, as well as the design of photovoltaic arrays, electrical design, monitoring system design, fire protection design, lightning protection design, and safety protection design. This document is applicable to the design, construction, commissioning, and acceptance of rooftop grid-connected photovoltaic power generation systems. The operation/investment, procurement, and maintenance of rooftop grid-connected photovoltaic power generation systems can also refer to this document for guidance. This document is not applicable to rooftop grid-connected photovoltaic power generation systems with energy storage, concentrating, tracking, double-sided power generation functions, or BIPV (Building Integrated Photovoltaics) forms. 2. Normative Reference Documents: Lists the standard documents referenced in the clauses of