T/EPIAJL 14-2024 Fire and storage collaborative emergency control system technical guidelines
T/EPIAJL 14-2024 Fire and storage collaborative emergency control system technical guidelines
Basic Information
Scope
Scope: This document applies to thermal power plants with heat storage boilers that access the public power grid and have the capability to provide black start services or meet other continuous operation requirements after the power plant is disconnected from the grid; Main technical content: This document specifies the overall requirements for the emergency control system of thermal power plants that combines heat storage and power generation, a system overview, and the technical requirements of various functional modules, including requirements for grid isolation identification and active disconnection control, rapid switching control requirements for safety and stability control devices, control mode switching requirements after grid isolation, rapid coordinated power regulation control requirements for heat storage and power generation units, execution requirements for coordinated control commands for thermal power units, and execution requirements for coordinated control commands for heat storage boilers, as well as requirements for quasi-synchronous grid connection control and wide-area dynamic synchronization monitoring.