T/CEEIA 504-2021 Active Group standards

T/CEEIA 504-2021 Six-phase pulse synchronous generator test guidelines

T/CEEIA 504-2021 Six-phase pulse synchronous generator test guidelines

Publish Date: 2021-06-07 Implement Date: 2021-06-07 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEEIA 504-2021
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Rotating motor
ICS Name: Generator
Publish Date: 2021-06-07
Implement Date: 2021-06-07

Scope

Scope: This document specifies the methods for factory inspection, on-site acceptance test, start-up test, and performance test of six-phase pulse synchronous generators (with a 30° phase shift in the double Y winding). This document is applicable to six-phase pulse synchronous generators (with a 30° phase shift in the double Y winding). Main technical content: This document specifies the methods for factory inspection, on-site acceptance test, start-up test, and performance test of six-phase pulse synchronous generators (with a 30° phase shift in the double Y winding). This document is applicable to six-phase pulse synchronous generators (with a 30° phase shift in the double Y winding).

Development Information

Related Standards

Contact Us