T/CSM GM76-2024 Active Group standards

T/CSM GM76-2024 Steel enterprise ultra-low emission design specification - Part 6: Electro-steelmaking process

T/CSM GM76-2024 Steel enterprise ultra-low emission design specification - Part 6: Electro-steelmaking process

Publish Date: 2024-09-30 Implement Date: 2024-10-15 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CSM GM76-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Metal production
Publish Date: 2024-09-30
Implement Date: 2024-10-15

Scope

Main technical content: This document specifies the design requirements for ultra-low emissions in the electric furnace steelmaking process of steel enterprises, including raw material preparation, electric furnace smelting, external refining, casting (or continuous casting), steel slag treatment, and steelmaking auxiliary processes. This document is applicable to the design and operation management of ultra-low emission control projects in the electric furnace steelmaking process of steel enterprises (excluding special smelting processes such as induction furnaces and electric slag furnaces). It can also be used as a reference for environmental impact assessment of construction projects, engineering consulting and design of environmental protection facilities, and operation and management after completion. The design of waste gas treatment projects in independent electric furnace steelmaking enterprises can be implemented with reference to this document.

Development Information

Related Standards

Contact Us