DL/T 5879-2024 Water and hydropower engineering double shield full-face tunnel boring machine construction organization design specification
DL/T 5879-2024 Water and hydropower engineering double shield full-face tunnel boring machine construction organization design specification
Basic Information
Scope
1.0.1 This standard is formulated to regulate the construction organization design of double-shield full-face tunnel boring machines in hydropower and water conservancy projects. 1.0.2 This standard applies to the construction of double-shield full-face tunnel boring machines in hydropower and water conservancy projects. 1.0.3 The construction organization design of double-shield full-face tunnel boring machines in hydropower and water conservancy projects should be based on actual conditions, coordinate the construction of various parts of the project, and actively promote new technologies, new materials, new processes, and new equipment that have been verified. 1.0.4 In addition to complying with the provisions of this standard, the construction organization design of double-shield full-face tunnel boring machines in hydropower and water conservancy projects shall also comply with the provisions of the relevant national standards currently in force.