T/GDWHA 0004-2022 Active Group standards

T/GDWHA 0004-2022 Urban River and Lake Water Environment Management Engineering Preliminary Design Report Preparation Guidelines

T/GDWHA 0004-2022 Urban River and Lake Water Environment Management Engineering Preliminary Design Report Preparation Guidelines

Publish Date: 2022-12-28 Implement Date: 2023-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/GDWHA 0004-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Integrated Environment and Environmental Protection
Publish Date: 2022-12-28
Implement Date: 2023-01-01

Scope

Main technical content: In order to standardize and strengthen the construction and management of urban river and lake water environment treatment projects, ensure the quality of survey and design, construction, and project safety, and in accordance with laws and regulations such as the Water Law of the People's Republic of China, the Flood Control Law of the People's Republic of China, the Water Pollution Prevention and Control Law of the People's Republic of China, and the Regulations on the Management of Survey and Design of Construction Projects, combined with the characteristics of urban river and lake water environment treatment projects, this document is formulated. During the preparation of this document, we extensively collected existing laws and standards at home and abroad, carefully summarized the practical experience of urban river and lake water environment treatment projects in China, and combined with the characteristics of Guangdong Province, it was formulated on the basis of extensive solicitation of opinions. This document stipulates the principles, work content, and work depth for the preparation of preliminary design reports for urban river and lake water environment treatment projects, including comprehensive explanations of the preliminary design report, water information, engineering geology, project tasks and scale, project layout and buildings, mechanical and electrical and metal structures, fire design, construction organization design, land acquisition and demolition, pipeline protection and relocation, environmental protection design, water and soil conservation design, labor safety and industrial hygiene, energy-saving design, project construction and operation management, monitoring and information management systems, design budgets, and project benefit evaluation. This document is applicable to the preparation of preliminary design reports for new, renovated, and expanded urban river and lake water environment treatment projects.

Development Information

Related Standards

Contact Us