NB/T 20435-2017 Active Industry standards-Energy

NB/T 20435-2017 Pressurized water nuclear power plant reactor commissioning and starting up core physics experiment

NB/T 20435-2017 Pressurized water nuclear power plant reactor commissioning and starting up core physics experiment

Publish Date: 2017-04-01 Implement Date: 2017-10-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Download

Basic Information

Standard Code: NB/T 20435-2017
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: \nNuclear island of a nuclear power plant
ICS Name: Other standards related to nuclear energy
Publish Date: 2017-04-01
Implement Date: 2017-10-01
Pages: 18 pages

Scope

This standard specifies the main test contents of the low-power physical test phase and the power-up phase physical test during the commissioning of a pressurized water reactor nuclear power plant, and provides the recommended test methods and acceptance criteria for completing the tests. The tests covered by this standard belong to the B3 and C phases specified in HAD 103/02, namely, the low-power test phase and the power test phase. This standard applies to the low-power physical test and the power-up phase physical test conducted during the commissioning of a pressurized water reactor nuclear power plant.

Development Information

Pages: 18 pages

Related Standards

Contact Us