YB/T 6102-2023 Active Industry standards-Black metallurgy

YB/T 6102-2023 The technical requirements for the recovery of pressure gas and idling gas from the blast furnace roof are as follows

YB/T 6102-2023 The technical requirements for the recovery of pressure gas and idling gas from the blast furnace roof are as follows

Publish Date: 2023-12-20 Implement Date: 2024-07-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: YB/T 6102-2023
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Coking and sintering equipment
ICS Name: Metallurgical equipment
Publish Date: 2023-12-20
Implement Date: 2024-07-01

Scope

This document specifies the recovery process, technical requirements, and safety and environmental protection measures for blast furnace top equalizing gas and quenching gas. This document is applicable to the recovery of blast furnace top equalizing gas and quenching gas.

Development Information

Related Standards

Contact Us