T/CSNAME 092-2024 Active Group standards

T/CSNAME 092-2024 Wave energy generation platform eagle head installation and inspection requirements

T/CSNAME 092-2024 Wave energy generation platform eagle head installation and inspection requirements

Publish Date: 2024-03-26 Implement Date: 2024-06-26 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CSNAME 092-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Deck equipment and devices
Publish Date: 2024-03-26
Implement Date: 2024-06-26

Scope

Main technical content: This document specifies the installation steps, installation methods, installation requirements, and inspection methods for the wave energy conversion devices of wave energy power generation platforms. This document is applicable to the installation and inspection of the eagle head of wave energy power generation platforms.

Development Information

Related Standards

Contact Us