T/SASE 015-2024 Active Group standards

T/SASE 015-2024 Fugitive gas-insulated welding process specification for steel domed all-welded LNG tank in full-pressure state

T/SASE 015-2024 Fugitive gas-insulated welding process specification for steel domed all-welded LNG tank in full-pressure state

Publish Date: 2024-04-28 Implement Date: 2024-05-28 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/SASE 015-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Welding and cutting
ICS Name: \nWelding process
Publish Date: 2024-04-28
Implement Date: 2024-05-28

Scope

Main technical content: LNG natural gas, as a clean energy source, is increasingly favored and its proportion in energy supply is rapidly increasing. Due to the fact that the temperature of LNG liquid natural gas is -165°C, the welding quality requirements for full-containment LNG storage tanks are relatively high. During the preparation of this document, extensive and in-depth investigations and studies were conducted on the application of gas metal arc welding to the steel domes and pressure rings of full-containment LNG storage tanks. Referencing relevant international standards and advanced foreign standards, this document was formulated. The main content of this document includes: definitions and terms related to LNG storage tanks and the gas metal arc welding used in them, material acceptance, welding wire use, welding processes, and quality inspection.

Development Information

Related Standards

Contact Us