GB/T 14541-1993
Replaced
NB/T 11020-2022
Active
Industry standards-Energy
NB/T 11020-2022 Intelligent Power Plant Design Standards
NB/T 11020-2022 Intelligent Power Plant Design Standards
Basic Information
Standard Code:
NB/T 11020-2022
Standard Type:
Industry standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Power station project
ICS Name:
Integrated power station
Publish Date:
2022-11-04
Implement Date:
2023-05-04
Scope
It is applicable to the design of new and expansion projects for thermal power plants, gas-steam combined cycle power plants, solar thermal power plants, and biomass power plants; and it is also applicable to the design of modification projects for in-service units. The main contents include: general provisions, terminology, basic regulations, overall planning and design, system design, functional design, on-site equipment, network security, and digital handover.
Development Information
Related Standards
GB/T 14542-1993
Replaced
GB/T 14542-1993 Guide for maintenance and supervision of transformer oil in service
GB/T 2819-1995
Active
GB/T 2819-1995 Mobile electric power plant, general specification for
GB/T 15149.2-1998
Abolished
GB/T 15149.2-1998 Performance and testing of teleprotection eguipment of power systems Part 2:Analogue comparison systems
GB/T 15153.1-1998
Replaced
GB/T 15153.1-1998 Telecontrol equipment and systems Part 2:Operating conditions Section 1:Power supply and electromagnetic compatibility
GB/T 17463-1998
Active