NB/T 31047.1-2022 Active Industry standards-Energy

NB/T 31047.1-2022 Wind power dispatching operation management specification Part 1: Onshore wind power generation

NB/T 31047.1-2022 Wind power dispatching operation management specification Part 1: Onshore wind power generation

Publish Date: 2022-11-04 Implement Date: 2023-05-04 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: NB/T 31047.1-2022
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Wind energy
ICS Name: Electric engineering (vocabulary)
Publish Date: 2022-11-04
Implement Date: 2023-05-04

Scope

This document stipulates the requirements for grid dispatching agencies and onshore wind farms (hereinafter referred to as wind farms) connected to the grid in terms of grid connection management, commissioning management, operation dispatching management, power generation planning management, maintenance management, relay protection and safety automatic device management, communication operation management, and dispatching automation management. This document is applicable to wind farms connected to the grid through transmission lines with a voltage level of 35 kV or higher. Wind farms connected to the grid through other voltage levels may refer to and implement this document accordingly.

Development Information

Same series standard

Replace the following standards

Related Standards

Contact Us