T/SDDP 7-2023 General Procedures for Concrete Floor Base Laying Work
T/SDDP 7-2023
Basic Information
Scope
Main technical content: I. Scope II. Normative reference documents III. Terms and definitions IV. Design 4.1 General provisions 4.2 Hierarchical design elements V. Materials 5.1 Cement 5.2 Aggregate 5.3 Mineral admixtures 5.4 Admixtures 5.5 Water 5.6 Reinforcing steel 5.7 Steel fibers 5.8 Separation layer materials 5.9 Curing materials VI. Construction 6.1 Information communication and preparation before construction 6.2 Overview of flooring construction 6.3 Construction of base concrete 6.4 Treatment of the base before laying the leveling layer 6.5 Pumping of leveling layer materials 6.6 Surface finishing of the leveling layer 6.7 Curing of the leveling layer 6.8 Surface finish protection VII. Acceptance 7.1 Inspection and testing of the base and leveling layer Appendix A: Evaluation methods for elevation and surface flatness Appendix B: Methods for on-site compressive strength testing of bonded and non-bonded leveling layers