GB/T 8713-1988
Abolished
DB62/T 5180-2025
Active
Gansu ProvinceLocal standards
DB62/T 5180-2025 Installing guidelines for molten salt pipelines in tower-type solar thermal power generation
DB62/T 5180-2025 Installing guidelines for molten salt pipelines in tower-type solar thermal power generation
Price:
$ 30
Basic Information
Standard Code:
DB62/T 5180-2025
Standard Type:
Local standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Pressure vessel
ICS Name:
Pipe components and pipelines
Publish Date:
2026-01-07
Implement Date:
2026-04-07
Scope
This document establishes the welding and installation requirements for molten salt pipelines in tower solar thermal power stations. This document is applicable to the installation of molten salt pipelines in tower solar thermal power systems. Other types of systems can refer to it according to actual circumstances.
Development Information
Related Standards
GB/T 16805-1997
Replaced
GB/T 16805-1997 Pressure testing of liquid petroleum pipelines
GB/T 18443.2-2001
Replaced
GB/T 18443.2-2001 Testing method of cryo-insulation pressure vessels—Vacuum measurement
GB/T 15345-2003
Replaced
GB/T 15345-2003 Test methods of concrete pipes for water transmission
GB/T 19284-2003
Replaced
GB/T 19284-2003 Hyperbaric chamber pressurized with medical oxygen
GB/T 19285-2003
Replaced