T/CAPEC 3-2018 Active Group standards

T/CAPEC 3-2018 Technical requirements of manufacturing consulting service for steam turbine

T/CAPEC 3-2018 Technical requirements of manufacturing consulting service for steam turbine

Publish Date: 2018-12-28 Implement Date: 2019-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 32.00
Out of stock

Basic Information

Standard Code: T/CAPEC 3-2018
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: \nBasic standards
ICS Name: Other services
Publish Date: 2018-12-28
Implement Date: 2019-01-01
Pages: 24 pages

Scope

This standard specifies the basic technical requirements for equipment supervision services related to the manufacturing quality of power station turbines and industrial turbine equipment. This standard is applicable to the use of power station turbines and industrial turbine equipment. The supervision of the manufacturing of other types of turbine equipment can be implemented with reference to this standard.

Development Information

Word Count: 38 Thousand words Pages: 24 pages

Referenced Standards

Related Standards

Contact Us