DB51/T 3149-2023 Active Sichuan ProvinceLocal standards

DB51/T 3149-2023 Sichuan Province Electric Power User's Power Supply Equipment and Distribution Equipment Operation, Maintenance, and Inspection Service Management Specification

DB51/T 3149-2023 Sichuan Province Electric Power User's Power Supply Equipment and Distribution Equipment Operation, Maintenance, and Inspection Service Management Specification

Publish Date: 2023-12-29 Implement Date: 2024-01-29 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: DB51/T 3149-2023
Standard Type: Local standards
Standard Status: Active
is_force_gb: no
CCS Name: Power stations and the operation and maintenance of power systems
ICS Name: The transmission grid and the distribution grid
Publish Date: 2023-12-29
Implement Date: 2024-01-29
Publisher: 四川省市场监督管理局
Technical Committee: 四川省经济和信息化厅
Pages: 25 pages

Scope

本文件规定了10kV及以下电力用户受电设施运行维护检修的内容、方法和要求。 本文件适用于四川省所有电力用户自有产权的10kV及以下受电设施运行管理、维护保养、检修、测试、缺陷及故障处理、应急保障、运维分析、设施状态评价管理规范与要求。适用于用户自行运行和委托第三方独立的运维、检修、调试单位。

Development Information

Drafting Units:

四川省产品质量监督检验检测院、四川省电力企业协会、四川华宇电力有限公司、四川省送变电建设有限责任公司、川开电气有限公司、四川万益能源科技有限公司、四川赛康智能科技股份有限公司

Drafting Persons:

易云平、廖强、任子春、迟景华、刘洪、赵长文、令狐代洪、陈德靖、张世宇、罗军、王东波、李增辉、许卫、刘世旭、杨忠汶、李军、曾德华、陶昌朋、郭永、杨沐、陈展、唐雯

Pages: 25 pages

Related Standards

Contact Us