T/GZWEA C07-2022 Active Group standards

T/GZWEA C07-2022 Guidance for the selection of outstanding chief engineers for water conservancy projects in Guizhou Province

T/GZWEA C07-2022 Guidance for the selection of outstanding chief engineers for water conservancy projects in Guizhou Province

Publish Date: 2022-05-24 Implement Date: 2022-05-24 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 22.00
Out of stock

Basic Information

Standard Code: T/GZWEA C07-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Hydraulic and hydroelectric projects
ICS Name: Hydraulic structures
Publish Date: 2022-05-24
Implement Date: 2022-05-24
Pages: 24 pages

Scope

1.1 In order to improve the technical and management level of water conservancy project survey and design in Guizhou Province, stimulate the progressiveness and sense of honor of water conservancy project survey and design technicians, guide and encourage water conservancy project designers to be dedicated to their work, and do a good job in project survey and design with high quality, high efficiency and high level, so as to give full play to their advanced demonstration effect in the industry, these guidelines are formulated.
1.2 The selection object of the Outstanding Design Engineer of Water Conservancy Projects in Guizhou Province (hereinafter referred to as "Outstanding Design Engineer") is the design engineer who serves as the design engineer of water conservancy construction projects in Guizhou Province, and his/her unit is a member unit of the Guizhou Provincial Water Conservancy Engineering Association (hereinafter referred to as "the Association"), and the individual is a personal member of the Association.
1.3 The application for Outstanding Design Engineer is on a voluntary basis. Individuals who meet the application conditions for Outstanding Design Engineer can apply for it after being recommended by their units.
1.4 Outstanding Design Engineers are selected once a year. The Association Secretariat shall organize and implement the selection according to these guidelines, and the review results shall be published on the Association's website and relevant media.

Development Information

Word Count: 18 Thousand words Pages: 24 pages

Related Standards

Contact Us