T/NXBX 024-2024 Design principles and technical specifications for the storage and regulation water project in the Yellow River irrigation district in Ningxia
T/NXBX 024-2024 Design principles and technical specifications for the storage and regulation water project in the Yellow River irrigation district in Ningxia
Basic Information
Scope
Scope: This document is applicable to the design of new irrigation water storage facilities in the Yinchuan irrigation area of Ningxia, which inject water from the Yellow River and non-polluted water with a volume of less than 1000×104 m3 and a dike height generally lower than 15 m, and are equipped with full geotextile membranes for anti-seepage. The design of other water storage and transformation projects for other purposes may be used as a reference. Main technical contents: This document stipulates the requirements for the investigation and evaluation of the current situation of water storage facilities in the Yinchuan irrigation area of Ningxia, engineering geological surveys, water scale forecasting and water balance, overall project layout, design of main buildings, special foundation treatment, mechanical and electrical equipment and automation, construction organization design, environmental impact assessment, water and soil conservation, project management, investment estimates (outlines), economic evaluation, and other design essentials, as well as the main contents of the design report preparation.