T/FSNY 0002-2024 Active Group standards

T/FSNY 0002-2024 Distributed Photovoltaic Power Generation Engineering Management Specification

T/FSNY 0002-2024 Distributed Photovoltaic Power Generation Engineering Management Specification

Publish Date: 2024-03-14 Implement Date: 2024-03-14 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/FSNY 0002-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Solar energy engineering
Publish Date: 2024-03-14
Implement Date: 2024-03-14

Scope

Main technical content: This document specifies the design requirements, construction requirements, equipment and system commissioning requirements, acceptance requirements, and operation and maintenance requirements for distributed photovoltaic power generation projects. This document is applicable to photovoltaic systems with a voltage level of 10 kV or lower, an installed capacity of no more than 6 MW, and installed on new or existing buildings, various structures, and rural and agricultural facilities

Development Information

Related Standards

Contact Us