T/SDCEAS 10053-2024 Active Group standards

T/SDCEAS 10053-2024 Greenway Evaluation Standards

T/SDCEAS 10053-2024 Greenway Evaluation Standards

Publish Date: 2024-08-30 Implement Date: 2024-09-15 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/SDCEAS 10053-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Integrated Road Engineering
Publish Date: 2024-08-30
Implement Date: 2024-09-15

Scope

Scope: In order to implement the national concept of green development, promote the high-quality development of green highways, ensure green performance, protect the environment, and standardize the evaluation methods of green highways, this standard is formulated. This standard applies to the evaluation of highways of all grades. In addition to complying with this standard, the evaluation of green highways shall also comply with the provisions of relevant national and Shandong provincial standards. Main technical content: The evaluation stages of this standard mainly include three phases: planning and design, construction, and operation and management. This standard serves as the basis for self-evaluation and third-party evaluation of the planning and design, construction, and operation and management of green highways. Green highways shall have environmental impact assessment documents and water and soil conservation plans approved by the relevant administrative authorities. Green highways shall be planned and designed in accordance with the requirements of GB/T 51328, and construction quality management shall be carried out in accordance with the requirements of GB/T 50430. Environmental monitoring during the construction period, water and soil conservation monitoring, and environmental supervision shall be carried out in accordance with the provisions of T/SACPES 001-2018. Green highways shall establish operation and maintenance supervision institutions, formulate daily operation and maintenance management plans and assessment systems, etc. The completion of the special acceptance and filing of the environmental protection and water and soil conservation facilities of the construction project shall be carried out in accordance with the prescribed procedures. The filing of the emergency response plans for environmental incidents during the operation period shall be completed in accordance with the regulations. The environmental protection facilities of the

Development Information

Related Standards

Contact Us