T/GDC 190-2022 Active Group standards

T/GDC 190-2022 Replacing ropes on overhead transmission lines with pre-wound wires using a robotic operation specification

T/GDC 190-2022 Replacing ropes on overhead transmission lines with pre-wound wires using a robotic operation specification

Publish Date: 2022-10-17 Implement Date: 2022-10-20 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/GDC 190-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: The integrated transmission and distribution network
Publish Date: 2022-10-17
Implement Date: 2022-10-20

Scope

Scope: This document specifies the requirements, methods, processes, and acceptance procedures for using pre-stranding repair robots to repair damaged conductors (ground wires) in overhead transmission lines during operation. This document is applicable to technical guidelines for robot equipment and system operations that can perform strand repair of damaged conductors (ground wires) on overhead transmission lines using pre-stranding techniques. Main technical content: Requirements, methods, processes, and acceptance procedures for using pre-stranding repair robots to repair damaged conductors (ground wires) in overhead transmission lines during operation.

Development Information

Related Standards

Contact Us