GB/T 34120-2023 Active National standards

GB/T 34120-2023 Technical requirements for power conversion system of electrochemical energy storage system

GB/T 34120-2023 Technical requirements for power conversion system of electrochemical energy storage system

Publish Date: 2023-12-28 Implement Date: 2024-07-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 122
Download

Basic Information

Standard Code: GB/T 34120-2023
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: New energy and other
ICS Name: Wind power generation systems and other energy sources
Publish Date: 2023-12-28
Implement Date: 2024-07-01
Pages: 41 pages

Scope

This document specifies the functional requirements of energy storage converters (hereinafter referred to as "energy storage converters") for electrochemical energy storage systems, including start-up and shutdown, power control, grid-connected and off-grid switching, alarm and protection, insulation resistance detection, communication, operation information monitoring, statistics, data display and storage, electrical performance and safety performance, as well as classification and coding, normal working conditions, appearance and protection grade, electromagnetic compatibility, auxiliary systems, inspection rules, marking, packaging, transportation, and storage requirements. This document is applicable to the design, manufacture, testing, operation, maintenance, and repair of energy storage converters using electrochemical batteries as energy storage carriers, with an AC port voltage of 35 kV or less.

Development Information

Word Count: 81 Thousand words Pages: 41 pages

Replace the following standards

Related Standards

Contact Us