T/CNS 68-2022 Active Group standards

T/CNS 68-2022 High-temperature gas-cooled nuclear power plant steam generator feedwater flow control system closed-loop test guidelines

T/CNS 68-2022 High-temperature gas-cooled nuclear power plant steam generator feedwater flow control system closed-loop test guidelines

Publish Date: 2022-12-16 Implement Date: 2023-04-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Download

Basic Information

Standard Code: T/CNS 68-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Energy, nuclear technology
ICS Name: Nuclear energy complex
Publish Date: 2022-12-16
Implement Date: 2023-04-01
Pages: 6 pages

Scope

Scope: This document is applicable to the closed-loop control loop test of the steam generator feedwater system in high-temperature gas-cooled reactor nuclear power plants (unit-based feedwater solution); Main technical content: This document specifies the requirements for the closed-loop test of the steam generator feedwater control system in high-temperature gas-cooled reactor nuclear power plants during the commissioning phase, including the test objectives, prerequisites, test steps, precautions, test data, and reports.

Development Information

Pages: 6 pages

Related Standards

Contact Us