T/CECS 1275-2023 Active Group standards

T/CECS 1275-2023 The ventilation and air conditioning design meteorological parameters standard for offshore nuclear power construction engineering

T/CECS 1275-2023 The ventilation and air conditioning design meteorological parameters standard for offshore nuclear power construction engineering

Publish Date: 2023-03-06 Implement Date: 2023-08-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CECS 1275-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Ventilation and air conditioning projects
ICS Name: The comprehensive construction industry
Publish Date: 2023-03-06
Implement Date: 2023-08-01

Scope

Main technical content: This standard is divided into 4 chapters and 4 appendices, and the main content includes: general provisions, terminology, classification of design meteorological parameters, and safety-level and non-safety-level design meteorological parameters, etc.

Development Information

Related Standards

Contact Us