GB/T 4773-1984
Replaced
T/STIC 110010-2021
Active
Group standards
T/STIC 110010-2021 Super supercritical secondary reheat turbine with an output of 1000MW
T/STIC 110010-2021 Super supercritical secondary reheat turbine with an output of 1000MW
Price:
$ 20.00
Basic Information
Standard Code:
T/STIC 110010-2021
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Gas turbines, steam turbines, and steam engines
Publish Date:
2021-11-22
Implement Date:
2021-11-30
Pages:
14 pages
Scope
Main technical content: This document specifies the term definitions, main body, auxiliary systems, control systems, and testing requirements for 1,000 MW-class ultra-supercritical reheated steam turbines. This document is applicable to 1,000 MW-class ultra-supercritical reheated steam turbines.
Development Information
Related Standards
GB/T 5578-1985
Replaced
GB/T 5578-1985 Specification for stationary steam turbines driving generator
GB/T 11369-1989
Replaced
GB/T 11369-1989 Light weight gas turbines exhaust smokes measurement
GB/T 11370-1989
Replaced
GB/T 11370-1989 Gas emissions measurement of light weight gas turbines
GB/T 11371-1989
Replaced
GB/T 11371-1989 Light weight gas turbine operation and maintenance
GB/T 13399-1992
Replaced