T/ZS 0616-2024 Active Group standards

T/ZS 0616-2024 Techniques for Reinforcement of Soft Earth Tunnel Using Radial Cement-soil Pile (TJS Method) Technical Specification

T/ZS 0616-2024 Techniques for Reinforcement of Soft Earth Tunnel Using Radial Cement-soil Pile (TJS Method) Technical Specification

Publish Date: 2024-05-31 Implement Date: 2024-06-07 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/ZS 0616-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Civil engineering and architecture
ICS Name: \nTunnel construction
Publish Date: 2024-05-31
Implement Date: 2024-06-07

Scope

Main technical content: 1 General Principles 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Provisions 4 Design 4.1 General Provisions 4.2 Design Calculations 4.3 Construction 5 Construction 5.1 General Provisions 5.2 Construction Preparation 5.3 Construction Equipment 5.4 Materials 5.5 Construction Processes 5.6 Monitoring 5.7 Construction Safety 5.8 Environmental Protection 6 Quality Inspection and Acceptance 6.1 General Provisions 6.2 Inspection 6.3 Acceptance Appendix A: TJS Construction Method Construction Record Form Appendix B: Project Batch Quality Inspection and Acceptance Record Form Explanation of Terms Used in This Procedure List of Referenced Standards Appendix: Clause Explanation

Development Information

Related Standards

Contact Us