T/ZGTXXH 003-2021 Rack-based digital energy device application technical requirements
T/ZGTXXH 003-2021 Rack-based digital energy device application technical requirements
Basic Information
Scope
Scope: This document specifies the technical requirements for the composition and configuration principles, engineering design, equipment installation, and project acceptance of rack-mounted digital energy equipment. This document applies to rack-mounted digital energy equipment projects in scenarios such as new construction, expansion, and renovation of data centers and communication buildings. Main technical content: This document specifies the technical requirements for the composition and configuration principles, engineering design, equipment installation, and project acceptance of rack-mounted digital energy equipment. This document applies to rack-mounted digital energy equipment projects in scenarios such as new construction, expansion, and renovation of data centers and communication buildings. Preface and Introduction: 1 Scope 2 Normative Reference Documents 3 Terms and Definitions 4 Equipment Composition and Configuration Principles 4.1 Equipment Composition 4.2 Equipment Configuration Principles 5 Engineering Design Requirements 5.1 General Provisions 5.2 Computer Room Requirements 5.3 Operating Environment 5.4 Equipment Arrangement 5.5 Wire Selection and Deployment 5.5.1 Wire Selection 5.5.2 Wire Deployment 5.6 System Lightning Protection and Grounding Requirements 5.7 Centralized Monitoring and Energy Management System Requirements for Power Environments 5.8 Seismic Resistance Requirements 5.8.1 Power Equipment Seismic Resistance Requirements 5.8.2 Equipment Installation Seismic Resistance Requirements 5.9 Fire Prevention Requirements 5.10 Environmental Protection Requirements 6 Equipment Installation Requirements 6.1 Pre-Installation Inspection 6.2 Equipment Cabinet Installation 6.3 Equipment Component Installation 6.4 Equipment Commissioning 6.4.1 General Provisions 6.4.2 Equipment Commissioning Content 7 Equipment Installation Project Acceptance 7.1 Pre