T/TJJZXH 4-2024 Active Group standards

T/TJJZXH 4-2024 Construction methods and procedures

T/TJJZXH 4-2024 Construction methods and procedures

Publish Date: 2024-11-25 Implement Date: 2024-11-30 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/TJJZXH 4-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Engineering construction drawing
Publish Date: 2024-11-25
Implement Date: 2024-11-30

Scope

Main technical content: preparation instructions; basements and water tanks; flooring; skirting boards, wall panels, and interior walls; ceilings and suspended ceilings; paint brushing and papering; exterior walls; roofs; drainage ditches, steps, and ramps; roads and sites; technical information

Development Information

Related Standards

Contact Us