GB/T 14541-1993
Replaced
T/CEC 540-2021
Active
Group standards
T/CEC 540-2021 Guidelines for Operation and Maintenance of Hydrogen Leakage Monitoring and Alarm System in Power Plants
T/CEC 540-2021 Guidelines for Operation and Maintenance of Hydrogen Leakage Monitoring and Alarm System in Power Plants
Price:
$ 20.00
Basic Information
Standard Code:
T/CEC 540-2021
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Integrated power station
Publish Date:
2021-12-06
Implement Date:
2022-03-01
Scope
This document specifies the components, general technical requirements, installation and commissioning, operation supervision and maintenance of the online monitoring and alarm system for hydrogen leakage in power plants. This document is applicable to the operation and maintenance of online monitoring and alarm systems for hydrogen leakage installed in hydrogen production (supply) stations and generator hydrogen systems in power plants. Other locations can also refer to and implement this document when using online monitoring and alarm systems for hydrogen leakage.
Development Information
Related Standards
GB/T 14542-1993
Replaced
GB/T 14542-1993 Guide for maintenance and supervision of transformer oil in service
GB/T 2819-1995
Active
GB/T 2819-1995 Mobile electric power plant, general specification for
GB/T 15149.2-1998
Abolished
GB/T 15149.2-1998 Performance and testing of teleprotection eguipment of power systems Part 2:Analogue comparison systems
GB/T 15153.1-1998
Replaced
GB/T 15153.1-1998 Telecontrol equipment and systems Part 2:Operating conditions Section 1:Power supply and electromagnetic compatibility
GB/T 17463-1998
Active