T/EJCCCSE 157-2024 Active Group standards

T/EJCCCSE 157-2024 Waterworks water conveyance tunnel lining construction requirements for formwork and concrete lining

T/EJCCCSE 157-2024 Waterworks water conveyance tunnel lining construction requirements for formwork and concrete lining

Publish Date: 2024-12-12 Implement Date: 2024-12-30 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/EJCCCSE 157-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Hydraulic structures
Publish Date: 2024-12-12
Implement Date: 2024-12-30

Scope

Main technical content: This document stipulates the general principles, construction preparation, initial support, and quality inspection and treatment of the foundation surface for the construction of concrete linings in hydraulic water conveyance tunnels; the fabrication and installation of reinforcing steel bars; the installation of pre-embedded components; the fabrication and installation of formwork; the construction of concrete linings; and the backfilling and grouting of tunnels, as well as quality inspections. This document is applicable to the construction of concrete linings in hydraulic water conveyance tunnels by moulding methods.

Development Information

Related Standards

Contact Us