T/CNAEC 0202-2022 Gas pipeline project feasibility study report preparation guideline
T/CNAEC 0202-2022 Gas pipeline project feasibility study report preparation guideline
Basic Information
Scope
Scope: This document establishes the content and depth of the preparation guidelines for feasibility studies of gas pipeline projects, and stipulates the document arrangement format. This document applies to the preparation of feasibility studies for new onshore gas pipeline projects, and the preparation of feasibility studies for modification and expansion projects shall be carried out with reference to this document. According to the needs of project construction and management development, this document proposes different requirements for the preparation of feasibility studies for trunk pipelines and branch pipelines. Among them, trunk pipelines refer to natural gas transmission pipelines connecting gas fields, coal-to-gas plants, LNG receiving stations, ports, pipelines to users, ports, or other pipelines; branch pipelines refer to natural gas pipelines connecting trunk pipelines to achieve distribution functions. Main technical content: This document applies to the preparation of feasibility studies for new onshore gas pipeline projects, and the preparation of feasibility studies for modification and expansion projects shall be carried out with reference to this document. According to the needs of project construction and management development, this document proposes different requirements for the preparation of feasibility studies for trunk pipelines and branch pipelines. Among them, trunk pipelines refer to natural gas transmission pipelines connecting gas fields, coal-to-gas plants, LNG receiving stations, ports, pipelines to users, ports, or other pipelines; branch pipelines refer to natural gas pipelines connecting trunk pipelines to achieve distribution functions.